Work Completion List

WORK GROUP WORK GROUP DESCRIPTION DOMESTIC ABROAD BUDGET
A1 BRIDGE and VIADUCT WORKS ✓   ₺37.365.000.00
A1 BRIDGE and VIADUCT WORKS ✓   ₺93.412.500.00
A1 BRIDGE and VIADUCT WORKS ✓   ₺144.750.000.00
A3 PIPE AND TRANSMISSION LINE WORKS   ✓ $22.365.000.00
A3 PIPE AND TRANSMISSION LINE WORKS ✓   ₺98.569.841.00
A3 PIPE AND TRANSMISSION LINE WORKS ✓   ₺246.424.602.50
A3 PIPE AND TRANSMISSION LINE WORKS ✓   ₺198.326.511.00
A4 DRINKING, USING WATER and SEWERAGE WORKS   ✓ $32.648.921.00
A4 DRINKING, USING WATER and SEWERAGE WORKS ✓   ₺79.878.745.00
A4 DRINKING, USING WATER and SEWERAGE WORKS ✓   ₺337.987.145.00
A4 DRINKING, USING WATER and SEWERAGE WORKS ✓   ₺199.696.862.00
A5 HIGHWAY WORKS   ✓ $137.874.512.00
A5 HIGHWAY WORKS ✓   ₺94.686.280.00
A5 HIGHWAY WORKS ✓   ₺113.623.536.00
A6 RAILWAY WORKS ✓   ₺85.217.652.00
A9 DAMS AND WATER STRUCTURES   ✓ $39.515.000.00
A9 DAMS AND WATER STRUCTURES ✓   ₺118.545.000.00
A10 SEA BUILDINGS ✓   ₺79.822.745.00
A11 TREATMENT PLANTS ✓   ₺139.874.412.00
A11 TREATMENT PLANTS   ✓ $49.686.030.00
A11 TREATMENT PLANTS ✓   ₺159.874.992.00
A16 INDUSTRIAL PLANT CONSTRUCTIONS ✓   ₺23.987.441.00
A16 INDUSTRIAL PLANT CONSTRUCTIONS ✓   ₺71.962.323.00
A16 INDUSTRIAL PLANT CONSTRUCTIONS   ✓ $179.905.807.50
A16 INDUSTRIAL PLANT CONSTRUCTIONS ✓   ₺215.886.969.00
A18 FIELD WORKS ✓   ₺123.987.400.00
B2 BUILDING WORKS ✓   ₺29.514.400.00
B2 BUILDING WORKS   ✓ $73.786.000.00
B2 BUILDING WORKS ✓   ₺88.543.200.00
B2 BUILDING WORKS ✓   ₺221.358.000.00
B2 BUILDING WORKS ✓   ₺265.629.600.00
C2 HEATING, COOLING, VENTILATION AND AIR CONDITIONING WORKS   ✓ $23.985.541.00
C2 HEATING, COOLING, VENTILATION AND AIR CONDITIONING WORKS ✓   ₺59.963.852.00
D1 ENERGY TRANSMISSION WORKS ✓   ₺111.891.557.50
D1 ENERGY TRANSMISSION WORKS ✓   ₺71.956.623.50