Work Completion List

WORK GROUP WORK GROUP DESCRIPTION DOMESTIC ABROAD BUDGET
A1 BRIDGE and VIADUCT WORKS   ₺37.365.000.00
A1 BRIDGE and VIADUCT WORKS   ₺93.412.500.00
A1 BRIDGE and VIADUCT WORKS   ₺144.750.000.00
A3 PIPE AND TRANSMISSION LINE WORKS   $22.365.000.00
A3 PIPE AND TRANSMISSION LINE WORKS   ₺98.569.841.00
A3 PIPE AND TRANSMISSION LINE WORKS   ₺246.424.602.50
A3 PIPE AND TRANSMISSION LINE WORKS   ₺198.326.511.00
A4 DRINKING, USING WATER and SEWERAGE WORKS   $32.648.921.00
A4 DRINKING, USING WATER and SEWERAGE WORKS   ₺79.878.745.00
A4 DRINKING, USING WATER and SEWERAGE WORKS   ₺337.987.145.00
A4 DRINKING, USING WATER and SEWERAGE WORKS   ₺199.696.862.00
A5 HIGHWAY WORKS   $137.874.512.00
A5 HIGHWAY WORKS   ₺94.686.280.00
A5 HIGHWAY WORKS   ₺113.623.536.00
A6 RAILWAY WORKS   ₺85.217.652.00
A9 DAMS AND WATER STRUCTURES   $39.515.000.00
A9 DAMS AND WATER STRUCTURES   ₺118.545.000.00
A10 SEA BUILDINGS   ₺79.822.745.00
A11 TREATMENT PLANTS   ₺139.874.412.00
A11 TREATMENT PLANTS   $49.686.030.00
A11 TREATMENT PLANTS   ₺159.874.992.00
A16 INDUSTRIAL PLANT CONSTRUCTIONS   ₺23.987.441.00
A16 INDUSTRIAL PLANT CONSTRUCTIONS   ₺71.962.323.00
A16 INDUSTRIAL PLANT CONSTRUCTIONS   $179.905.807.50
A16 INDUSTRIAL PLANT CONSTRUCTIONS   ₺215.886.969.00
A18 FIELD WORKS   ₺123.987.400.00
B2 BUILDING WORKS   ₺29.514.400.00
B2 BUILDING WORKS   $73.786.000.00
B2 BUILDING WORKS   ₺88.543.200.00
B2 BUILDING WORKS   ₺221.358.000.00
B2 BUILDING WORKS   ₺265.629.600.00
C2 HEATING, COOLING, VENTILATION AND AIR CONDITIONING WORKS   $23.985.541.00
C2 HEATING, COOLING, VENTILATION AND AIR CONDITIONING WORKS   ₺59.963.852.00
D1 ENERGY TRANSMISSION WORKS   ₺111.891.557.50
D1 ENERGY TRANSMISSION WORKS   ₺71.956.623.50